Algorithm: How Battery Controller Optimizes Your Schedule

This document explains step by step how the dynamic programming (DP) engine in Battery Controller calculates the optimal charge/discharge schedule for your battery.

For the operational side — coordinators, intervals, and why the schedule changes between runs — see How it works.

flowchart TD
    IN["<b>Inputs</b><br/>prices, PV forecast, consumption forecast,<br/>battery specs, current SoC"] --> DISC

    DISC["<b>1. Discretize</b><br/>time steps x SoC states (10 Wh)<br/>x power actions (100 W)"] --> TERM

    TERM["<b>2. Terminal condition</b><br/>V[T][s] = -(soc_kwh x feed_in_price_T)"] --> BACK

    BACK["<b>3. Backward pass</b><br/>V[t][s] = min over actions of<br/>(step_cost + V[t+1][s'])"] --> FWD

    FWD["<b>4. Forward pass</b><br/>follow best_action[t][soc]<br/>from the current SoC"] --> FILT

    FILT["<b>5. Oscillation filter</b><br/>drop charge/discharge pairs whose<br/>spread cannot cover wear + losses"] --> OUT

    BACK -.->|"lambda = -dV[0]/dSoC"| SHADOW["<b>Shadow price</b><br/>marginal value of storage"]

    OUT["<b>Schedule</b><br/>power target per 15-min step"]

    style BACK fill:#0f766e22,stroke:#0f766e
    style SHADOW fill:#b4530922,stroke:#b45309
Loading

Table of Contents

  1. Problem Statement
  2. Inputs
  3. State Space Discretization
  4. Cost Function (Step Cost)
  5. Terminal Condition
  6. Backward Pass (Backward Induction)
  7. Forward Pass (Schedule Extraction)
  8. Post-Processing Filters
  9. Shadow Price Calculation
  10. Rolling-Horizon Execution
  11. Numerical Considerations
  12. Multi-Battery Dispatch

1. Problem Statement

The optimizer answers this question for every 15-minute run:

Given the current battery state of charge (SoC) and forecasts of prices, PV production, and household consumption for the next N hours, what charge/discharge power should the battery apply at each time step to minimize total electricity cost?

"Total cost" includes:

  • Grid import costs (buying electricity)
  • Grid export revenue (selling electricity, negative cost)
  • Battery degradation cost (wear per full charge+discharge cycle)

The optimizer must respect physical constraints: SoC must stay within [min_soc, max_soc], and power must stay within [-max_discharge, max_charge].


2. Inputs

Input Unit Description
current_soc_kwh kWh Current battery state of charge
price_forecast[t] EUR/kWh Grid buy price for each time step
feed_in_forecast[t] EUR/kWh Grid sell (export) price for each time step
pv_forecast[t] kW AC-side PV production for each time step
pv_dc_forecast[t] kW DC-coupled PV production for each step (optional)
consumption_forecast[t] kW Expected household consumption for each step
step_durations_hours[t] h Duration of each time step (typically 0.25 h = 15 min)
degradation_cost_per_cycle EUR/cycle Battery wear cost per full charge+discharge cycle (converted to EUR/kWh by coordinator: ÷ (2 × usable_kwh) — one cycle is charge + discharge throughput)
min_price_spread EUR/kWh Minimum buy/sell spread to trigger arbitrage. Enters the DP objective as min_price_spread / 2 per kWh of commanded throughput (see §4.5), so a full cycle must clear 2 × degradation + min_price_spread

Battery configuration:

Parameter Description
capacity_kwh Total battery capacity
min_soc_kwh / max_soc_kwh Operating SoC limits
max_charge_power_kw / max_discharge_power_kw Nominal power limits
charge_efficiency_curve Charge efficiency as a function of power (see §4.1)
discharge_efficiency_curve Discharge efficiency as a function of power (see §4.1)
pv_dc_coupled Whether DC-coupled PV is present
pv_dc_efficiency DC MPPT + DC-DC conversion efficiency (~0.97)
max_grid_power_kw Grid connection cap, applied to the action set on import and as curtailment on export (0 = unlimited) — see §4.5
high_soc_charge_threshold_pct Above this SoC (%), charge is limited to high_soc_max_charge_kw
high_soc_max_charge_kw Derated charge limit above threshold (0 = no derating)
low_soc_discharge_threshold_pct Below this SoC (%), discharge is limited to low_soc_max_discharge_kw
low_soc_max_discharge_kw Derated discharge limit below threshold (0 = no derating)

3. State Space Discretization

The DP operates on a discrete grid of SoC states and power actions. Continuous SoC and power are approximated by finite grids to make the problem tractable.

3.1 SoC Grid

The SoC range [min_soc_kwh, max_soc_kwh] is divided into evenly spaced states:

soc_res_target   = max(SOC_RESOLUTION_WH, (max_soc_wh - min_soc_wh) / MAX_SOC_STATES)
n_soc_states     = round((max_soc_wh - min_soc_wh) / soc_res_target) + 1
soc_resolution_wh = (max_soc_wh - min_soc_wh) / (n_soc_states - 1)   # exact fit
soc_states[i]    = min_soc_wh + i × soc_resolution_wh
  • SOC_RESOLUTION_WH (default: 10 Wh) is the base grid constant; the power step is derived from it.
  • MAX_SOC_STATES (default: 1000) bounds the state count. DP cost scales with n_steps × n_soc_states × n_actions, so at a fixed 10 Wh the solve time grows linearly with usable capacity — a 44 kWh usable range needs 4401 states versus 801 for an 8 kWh one, and takes proportionally longer for no added decision quality. Above the budget the resolution is coarsened so the state count stays bounded.
  • The cap engages only above 10 kWh of usable range (MAX_SOC_STATES × SOC_RESOLUTION_WH). Typical home batteries keep the exact 10 Wh grid and are unaffected.
  • At the cap the resolution is 0.1% of usable capacity (e.g. 44 Wh on a 44 kWh range), well below SoC sensor accuracy (~1%). Changing the grid does shift which SoC levels are representable, so realized savings move by a few percent in either direction — this is discretization jitter, not a systematic loss, and is inherent to any grid choice.
  • Because the power step is derived from the resolution (§3.2), a coarser grid also widens the action step, compounding the speedup on large batteries.
  • The resolution is shrunk so the grid divides the usable range exactly, making the top state exactly max_soc_wh. With a fixed resolution a range that is not a whole multiple of it left the last few Wh unreachable, and the fill-to-max boundary action then charged to a SoC that the state it was credited to did not represent. Shrinking the step rather than adding a state keeps the MAX_SOC_STATES budget intact.
  • SoC boundaries are rounded to the nearest Wh to prevent floating-point comparison errors (e.g. 212.0 < 212.00000000000003).

3.2 Power Action Grid

The power step uses POWER_STEP_W as a practical minimum to prevent unprofitable trickle actions at near-marginal prices. The aligned step ensures the smallest action crosses at least one SoC state:

aligned_step_w   = soc_resolution_wh / full_step_hours   (e.g. 10 Wh / 1 h = 10 W)
power_step_w     = max(POWER_STEP_W, aligned_step_w)      (e.g. max(100, 10) = 100 W)
charge_actions   = [max_charge_w, ..., 2×step, step, 0]   (highest-first)
discharge_actions = [-step, -2×step, ..., -max_discharge_w] (lowest-first)
actions = discharge_actions + charge_actions

Boundary actions are evaluated separately for each SoC state after the main action loop to capture the residual capacity that the 100 W grid cannot reach (up to ~115 Wh per step):

drain_w = (soc_wh - min_soc_wh) × dis_eff(drain_w) / step_hours   → new_soc_idx = 0
fill_w  = (max_soc_wh - soc_wh) / (step_hours × chg_eff(fill_w)) → new_soc_idx = n_soc_states − 1

The boundary power appears on both sides (the efficiency depends on the very power being solved for), so it is found by fixed-point iteration: seed with the representative scalar, then re-evaluate the curve at the resulting power twice. The curves are smooth and the residual capacities small, so two passes converge. A single zero-power scalar would be wrong by tens of percentage points on a steep curve, because boundary powers land in exactly the steep part-load region.

new_soc_idx is set directly (not recomputed via the energy formula) to avoid floating-point errors at exact boundaries.

  • full_step_hours is the duration of a regular (non-partial) time step. A partial first step (e.g. 3 minutes remaining before the next price boundary) must not shrink power_step_w for all subsequent full steps.
  • Charge actions are listed highest-first so that the DP's "first equal wins" tie-breaking naturally produces front-loaded charging (maximum power immediately rather than a ramp-up).
  • The global action list is built from the nominal (unconstrained) maxima. Per-state derating is applied in the backward pass (see Section 6).

4. Cost Function (Step Cost)

calculate_step_cost(t, s, a) computes the cost of applying action a (W) at time step t with SoC s (Wh). All values in this section refer to a single time step of duration dt hours.

4.1 Efficiency Model

Each direction (charge / discharge) has its own power-dependent efficiency curve: a piecewise-linear function mapping AC power (kW) → efficiency (0–1).

Two physical effects act in opposite directions. Cell I²R (resistive) losses grow with current, so the battery alone gets slightly worse at high power. But in a complete system that is swamped by the inverter's fixed idle loss (roughly 30–60 W), which has to be paid out of whatever power is flowing: it consumes a third or more of the energy at 100 W and is negligible at 5 kW. Measured curves therefore rise steeply from low power and then flatten. This matters because a home battery spends much of the night discharging at 100–300 W, exactly where the curve is worst.

Configuration format: a plain scalar (e.g. 0.95) produces a flat curve valid at all power levels. A colon-separated list (e.g. 0:0.95, 5:0.92) defines breakpoints that are linearly interpolated; efficiency is clamped flat outside the specified range.

Measured curves for real hardware: see efficiency-curves.md for ready-to-paste curves for named home battery systems, based on the HTW Berlin "Stromspeicher-Inspektion 2026" lab measurements, plus guidance on deriving a curve for hardware that is not listed.

Representative scalar efficiency: some consumers need one number instead of the full curve — the oscillation filter threshold, the displayed thresholds on the shadow price sensor and diagnostics. (The hybrid-mode decisions are not among them: they interpolate the curve at the power actually under consideration, so they compare against λ on the same terms the DP priced that action with. The scalar is only their fallback at zero power.) That scalar is the arithmetic mean of the curve sampled at 10 points from 5 % to 95 % of nominal power (the sampling used by the HTW Berlin efficiency guideline, so it is comparable to published mean path efficiencies), and round_trip_efficiency = charge_eff_repr × discharge_eff_repr. For a symmetric flat curve at 0.9487: RTE ≈ 0.90, identical to the pre-curve implementation.

Sampling at zero power instead would take the single worst point of a realistic curve — for a measured curve it yields RTE 0.64 where the true operating value is 0.93, inflating every threshold derived from it by ~20 % and effectively suppressing arbitrage and PV capture.

Per-action interpolation: inside the DP backward pass, each candidate action uses:

action_kw  = |action_w| / 1000
charge_eff = interpolate(charge_curve, action_kw)   # for action_w > 0
dis_eff    = interpolate(discharge_curve, action_kw) # for action_w < 0

SoC transitions use the action-specific efficiency:

charging:    new_soc = soc + action_w × dt × charge_eff
discharging: new_soc = soc − |action_w| × dt / dis_eff

Boundary actions (drain to min / fill to max) solve for the boundary power by fixed-point iteration on the curve (see §3).

Multi-battery aggregation: curves are indexed by power, so they are combined on the power axis rather than averaged at the same absolute power. Each battery carries a share of the aggregate power proportional to its own rating and is evaluated at share_i × P; the aggregated curve spans 0..Σ max_power. The two directions combine differently because efficiency enters the SoC transition differently:

charge:    eff(P) = Σ share_i × eff_i(share_i × P)
discharge: eff(P) = 1 / Σ share_i / eff_i(share_i × P)

Calibration: runtime efficiency corrections are applied as scalar multipliers to each curve point:

charge override:    [(p, min(1.0, eff × correction)) for p, eff in charge_curve]
discharge override: [(p, max(1e-6, eff / correction)) for p, eff in discharge_curve]

The corrected curves are used for SoC transitions only. The economic cost model (grid cost + degradation) always uses the nominal curves, so a charging/discharging-speed problem is not double-counted as extra energy cost or degradation. Discharge override points may exceed 1.0 after scaling; this is safe precisely because they never enter the cost model.

DC-coupled PV uses its own path efficiency (pv_dc_efficiency ≈ 0.97, MPPT only, no AC conversion).

4.2 Charging (action_w > 0)

When charging at AC setpoint P (W):

  1. AC grid draw: the grid supplies the setpoint directly; conversion losses are internal to the inverter and captured in the SoC transition:

    grid_to_battery_w = P
    ac_stored_wh      = P × dt × charge_eff
    
  2. Passive DC PV continues on top: the AC setpoint only controls AC-side exchange — DC MPPT charging is independent of it and fills the headroom that remains after the AC-charged energy:

    headroom_wh       = max(0, max_soc_wh - soc_wh - ac_stored_wh)
    charge_budget_wh  = max_charge_power_kw × 1000 × dt − ac_stored_wh
    passive_charge_wh = min(pv_dc_production_w × dc_eff × dt, headroom_wh, charge_budget_wh)
    
  3. Remaining DC PV not absorbed by the battery flows to AC through the inverter at 96% efficiency.

  4. Throughput: tracked in two buckets — ac_stored_wh / 1000 kWh commanded by the setpoint and passive_charge_wh / 1000 kWh absorbed passively by the MPPT. Degradation applies to both; the arbitrage hurdle (§4.5) only to the commanded part.

4.3 Discharging (action_w < 0)

When discharging at setpoint P (W, negative):

usable_power_w   = |P| × discharge_eff    (power delivered to home AC side)
grid_to_battery_w = -usable_power_w       (negative = flows away from grid)
throughput_kwh    = |P| × dt / 1000

All DC PV excess flows to AC while discharging.

4.4 Idle (action_w == 0)

No explicit grid power, but DC-coupled PV still passively charges the battery up to available headroom:

headroom_wh      = max_soc_wh - soc_wh
charge_budget_wh  = max_charge_power_kw × 1000 × dt
passive_charge_wh = min(pv_dc_production_w × dc_eff × dt, headroom_wh, charge_budget_wh)
throughput_kwh    = passive_charge_wh / 1000

4.5 Net Grid Exchange and Final Cost

total_ac_pv_w = pv_production_w + dc_pv_excess_w × DC_TO_AC_INVERTER_EFF
net_grid_w    = consumption_w - total_ac_pv_w + grid_to_battery_w

If max_grid_power_kw > 0, only the export side is clamped: net_grid_w = max(-cap, net_grid_w). PV that cannot be exported is curtailed, and zero revenue is what curtailment costs, so discharging past the cap is self-limiting — it earns nothing and still pays degradation.

Import is deliberately not clamped here. Capping the price of over-cap import makes that import free: the SoC keeps rising while the cost stops growing, so the DP charges at full power whenever the cap is binding. A 4 kW cap produced plans with 7.1 kW of grid flow. The connection limit is a constraint on what the battery may do, so it bounds the action set instead:

charge_limit_w = max(0, max_grid_power_kw × 1000 − consumption_w + ac_pv_w)

applied alongside the SoC-dependent battery limit in both DP passes (max_chg_w = min(soc_max_charge_w, charge_limit_w)). ac_pv_w is AC-side PV only: how much DC-coupled PV reaches the AC bus depends on how much the battery absorbs, and assuming none of it does is the bound that cannot be violated.

When household load alone exceeds the cap the headroom is zero, so no charging is scheduled — and the resulting over-cap import is still priced in full, in the schedule and in the baseline alike.

energy_kwh = |net_grid_w| × dt / 1000

grid_cost = energy_kwh × grid_price      (if net_grid_w > 0: buying)
          = -energy_kwh × feed_in_price  (if net_grid_w < 0: selling)

degradation_cost_per_kwh = degradation_cost_per_cycle / (2 × usable_kwh)  (conversion in coordinator; a full cycle = 2 × usable_kwh throughput)
degradation_cost = (ac_throughput_kwh + passive_throughput_kwh) × degradation_cost_per_kwh

arbitrage_cost_per_kwh = min_price_spread / 2
arbitrage_cost = ac_throughput_kwh × arbitrage_cost_per_kwh

step_cost = grid_cost + degradation_cost + arbitrage_cost

Arbitrage hurdle. min_price_spread is the user's "do not bother below this" threshold. Charging half of it per kWh of commanded throughput in each direction makes one full cycle carry 2 × degradation + min_price_spread — the same threshold the oscillation filter (§8.1) applies, but now inside the objective the DP minimises.

Passive DC-PV charging is exempt: the MPPT absorbs it whatever the AC setpoint is, so it is not an arbitrage decision and must not be discouraged. That is why throughput is tracked in two buckets.

The hurdle steers decisions but is not money: total_cost, raw_total_cost and savings are all recomputed over the resulting schedule with arbitrage_cost_per_kwh = 0, so reported figures stay comparable to the battery-free baseline.

Applying the hurdle only afterwards, as the filter used to do on its own, meant the DP solved a different problem than the one configured and a window heuristic then thinned out the answer. On quarter-hourly prices that cost 12 % to 61 % of the achievable savings in measured scenarios; with the hurdle in the objective the same filter removes 0.1 % to 1 %, because there is little left for it to find.


5. Terminal Condition

The DP looks N steps into the future. At time T (end of horizon), the battery still holds energy. Without a terminal value, the DP would irrationally discharge the battery just before the horizon ends (energy "disappears" after step N).

The terminal value of being in SoC state s is:

V[T][s] = -(stored_kwh × terminal_price)

where stored_kwh = (soc_wh - min_soc_wh) / 1000.

The negative sign is because V represents cost — more stored energy means lower cost (more future value).

Choosing terminal_price:

max(0, min(feed_in_forecast[-1], clipped average of the last 6 h of feed-in prices)) — a blended tail that dampens transient price spikes at the forecast boundary, clamped at 0 so a negative feed-in tail never penalizes stored energy (the horizon end is artificial; the battery is never forced to sell at a loss). The shadow price from the previous run is deliberately not used as terminal value: λ ≈ sqrt(RTE) × P_best, so using it would make discharge at the best price hour break-even and suppress discharge exactly at the peak (a circular dependency in rolling-horizon re-optimization). The shadow price is only used by the hybrid/hybrid+ modes as the charge/discharge (and, in hybrid+, surplus-capture) switching threshold.


6. Backward Pass (Backward Induction)

This is the core of the algorithm. It computes the value function V[t][s]: the minimum achievable total cost from time t to the end of the horizon, starting in SoC state s.

The Bellman equation is:

V[t][s] = min over all actions a of:
               step_cost(t, s, a) + V[t+1][s']

where s' is the SoC state after applying action a:

  • Charging: s' = s + a × dt × charge_eff(|a|/1000) plus passive DC PV charging up to the remaining headroom and the remaining charge-power budget (if DC-coupled). The AC setpoint and the MPPT share one battery-side budget of max_charge_power_kw × dt, so an array larger than the inverter cannot charge the pack faster than its rating, and an AC command cannot be stacked on top of a full-rate passive charge
  • Discharging: s' = s - |a| × dt / dis_eff(|a|/1000) (energy drawn from battery, with losses)
  • Idle: s' = s (or passive DC PV charging if DC-coupled)

The backward pass runs from t = N-1 down to t = 0:

# Pre-compute per-state power limits (outside the t-loop for performance)
soc_max_charge_w[s]    = max_charge_at_soc(soc_states[s])
soc_max_discharge_w[s] = max_discharge_at_soc(soc_states[s])

for t in range(N-1, -1, -1):
    for s in all_soc_states:
        best_cost = infinity
        best_action = 0

        for a in all_actions:
            if a > 0 and a > soc_max_charge_w[s]:
                continue   # SoC-dependent charge derating
            if a < 0 and |a| > soc_max_discharge_w[s]:
                continue   # SoC-dependent discharge derating

            s' = transition(s, a, t)
            if s' < min_soc or s' > max_soc:
                continue   # SoC boundary violation
            if a != 0 and nearest_soc_idx(s') == nearest_soc_idx(s):
                continue   # sub-resolution action — skip to avoid ghost "free" moves

            cost = step_cost(t, s, a) + V[t+1][nearest_soc_idx(s')]
            if cost < best_cost:
                best_cost = cost
                best_action = a

        V[t][s] = best_cost
        policy[t][s] = best_action

SoC-dependent derating: Some batteries (e.g. Marstek Venus A) reduce their max charge/discharge power near SoC extremes (BMS absorption). The per-state limits soc_max_charge_w[s] and soc_max_discharge_w[s] are precomputed before the outer time loop using BatteryConfig.max_charge_at_soc() and max_discharge_at_soc(). For batteries without derating (the default), these equal the nominal maxima and the guards never fire.

Effect on the schedule: Because backward induction propagates future costs, the DP at step t already "knows" that entering a derated SoC zone at t+1 constrains future power. This causes the optimizer to front-load discharge before the low-SoC threshold — for example, discharging at 1200 W in earlier steps rather than running out of power at 380 W near empty.

Sub-resolution skip rule: If a non-zero action does not move the SoC to a different discrete state, the DP sees it as "free" (no change in V[t+1]) but the step cost still includes RTE losses. Allowing such actions causes spurious micro-charging/discharging at zero apparent benefit. These actions are skipped. Idle (a = 0) is exempt because passive DC PV may still move the SoC bin.

After the backward pass, V[0][s] gives the optimal total cost from now to the horizon for each starting SoC, and policy[t][s] gives the optimal action.


7. Forward Pass (Schedule Extraction)

The forward pass re-evaluates the V-table at the actual continuous SoC instead of snapping to the nearest discrete state and following the policy table. At each step it enumerates the same action set as the backward pass (including boundary actions) and picks the minimum-cost action:

current_soc = current_soc_kwh * 1000  # continuous, not snapped

for t in range(N):
    soc_idx = nearest_soc_idx(current_soc)
    best_action, best_new_soc = argmin over all actions a:
        step_cost(t, current_soc, a) + V[t+1][nearest_soc_idx(new_soc_after(a))]

    record best_action as power_schedule_kw[t]
    current_soc = best_new_soc
    soc_schedule_kwh[t+1] = current_soc / 1000

The sub-resolution skip still applies: non-zero actions that do not cross a SoC state boundary are skipped. Boundary actions (exact drain-to-min / fill-to-max) are also evaluated as in the backward pass.

This eliminates the SoC discretisation error that accumulates when the policy for a neighbouring discrete state differs from the optimal action at the true SoC.

This gives:

  • power_schedule_kw[t] — battery power at each step (positive = charge)
  • mode_schedule[t]"charging", "discharging", or "idle"
  • soc_schedule_kwh[t] — expected SoC at the start of each step

8. Post-Processing Filters

After the forward pass, two filters clean up the schedule.

8.1 Oscillation Filter

Since min_price_spread moved into the DP objective (§4.5), the schedule reaching this filter already respects the arbitrage threshold. The filter is now a safety net for discretisation artefacts rather than the mechanism that enforces the threshold, and it typically changes nothing.

Cost guard. Its verdict is accepted only when it does not cost money: both the raw and the filtered schedule are priced with _calculate_schedule_total_cost (real money, no arbitrage hurdle) and the cheaper one is returned. The DP evaluates the exact cost model, while this filter works from a much cruder proxy — it prices every discharged watt above the instantaneous residual load at the feed-in price, ignores the terminal value of stored energy, and pairs steps by a fixed lookahead window instead of by the SoC trajectory that actually links them. Where the two disagree, the DP is right. Measured over simulated days the guard was worth ~3 % of achievable savings on quarter-hourly prices and ~0.1 % on hourly ones: the finer the price resolution, the more the window heuristic misfires.

Minimum profitable spread: For arbitrage to be worthwhile, the discharge price must exceed the charge price by at least:

_rte      = chg_eff_repr × dis_eff_repr   # representative RTE scalar (see §4.1)
min_arbitrage_spread = (2 × degradation_cost_per_kwh + min_price_spread) / sqrt(_rte)

The representative scalar (mean over 5..95 % of nominal power) is used rather than the zero-power value, which would overstate the required spread by ~20 % on a realistic curve and strip profitable arbitrage pairs.

Algorithm: Iterative lookahead scan (repeated until no more changes):

for each step i:
    if mode[i] == "charging":
        search steps i+1 to i+window for the next "discharging" step j
        effective_spread = discharge_price[j] - charge_cost[i] / RTE
        if effective_spread < min_arbitrage_spread:
            suppress step i (set to idle)
            mark changed = True

    if mode[i] == "discharging":
        search steps i+1 to i+window for the next "charging" step j
        effective_spread = discharge_price[i] - charge_cost[j] / RTE
        if effective_spread < min_arbitrage_spread:
            suppress step i (set to idle)
            mark changed = True

When there is a PV surplus at a charging step (PV production > consumption), the charge cost is the feed-in opportunity cost (what could have been earned by exporting that PV) rather than the grid buy price.

DC-coupled PV: Passive DC PV charging happens regardless of the AC setpoint (idle and active charging alike), so the commanded charge power is AC-only and the filter prices it directly against the PV-surplus/grid blend — no passive-DC deduction is needed.

The window size is max(2 h, battery_capacity / max_discharge_power) — larger batteries need a wider window because a full charge/discharge cycle takes longer.

After suppression, the SoC schedule is recalculated to remain consistent.

8.3 PV Curtailment Override

When the PV Curtailed switch is enabled in the integration, the coordinator zeroes both pv_forecast and pv_dc_forecast before passing them to the optimizer. This corrects for the case where solar inverters automatically shut down at negative feed-in prices, leaving the controller with a phantom PV production in its forecast.

Effect on the optimizer:

  • net_load is higher (consumption is no longer offset by PV) → more incentive to charge at negative prices.
  • DC PV passive charging is removed from SoC transitions → the DP no longer expects "free" battery top-up from the sun.
  • With negative prices the optimal action is charging from the grid; zeroing PV ensures the planned charge rate is not artificially reduced by expected solar contribution.

Effect on real-time control:

  • Zero-grid mode: instead of reacting to the live grid sensor (which would trigger discharging to cover load), the controller follows the DP schedule. With negative prices and zeroed PV that schedule is charging, not discharging.
  • Hybrid/follow-schedule: unchanged — the corrected forecast is already reflected in the optimizer output.

This flag is a manual override, intended to be toggled by a Home Assistant automation that watches the inverter's export-limitation status sensor.


8.2 Micro-Cycle Filter

Very short charge or discharge segments (e.g. a single 15-minute slot) move so little energy that wear per kWh of useful storage becomes disproportionately high — the part of ageing that a per-kWh degradation price cannot express, because it is per cycle rather than per throughput. Any contiguous block of charging or discharging that moves less than MIN_CYCLE_KWH (default: 0.2 kWh) is replaced with idle. If no micro-cycles are found, the filter returns the schedule unchanged without rebuilding.

Block energy is measured on the battery side — P × charge_eff × dt when charging, P / discharge_eff × dt when discharging — which is the quantity that actually wears the cells and the same one degradation is priced on. Measuring the AC setpoint instead misjudged blocks near the threshold by the efficiency factor, in opposite directions for the two directions.

Unlike the oscillation filter this is deliberately not gated on cost: the wear it avoids is real but unpriced, so a cost guard would disable it entirely. It is not free either — over simulated quarter-hourly days it suppresses a handful of steps per day and costs on the order of 2 % of achievable savings. MIN_CYCLE_KWH is the knob: raise it to trade more savings for less wear, lower it for the reverse.

Step 0 is sized on the reference (full) interval rather than its own, shortened duration. It covers only the remainder of the current price period and can be as little as a minute, so measuring it on that duration judged an action by when the optimizer happened to run rather than by its economics — the same correction the oscillation filter applies to its lookahead window.


9. Shadow Price Calculation

The shadow price λ is the marginal value of one additional kWh stored in the battery right now. It is derived numerically from the value function using a central difference:

λ = -dV[0]/dSoC = (V[0][s-1] - V[0][s+1]) / (2 × ΔSoC_kWh)
  • V is cost (lower is better), so adding energy reduces cost → the gradient is negative → λ is positive.
  • For boundary SoC states, a one-sided difference is used.

Interpretation: Let chg_r = chg_eff_repr and dis_r = dis_eff_repr (representative scalars, §4.1):

  • If the current grid buy price is less than λ × chg_r, it is profitable to charge — 1 kWh bought from AC stores chg_r kWh worth λ each.
  • If the current feed-in price is greater than λ / dis_r, it is profitable to discharge/export — 1 stored kWh yields dis_r kWh on the AC side.

Charge-speed correction: when runtime calibration detects that the battery gains less SoC per time step than modelled, the optimizer reduces the charge-side efficiency curve for the planned SoC transitions. Economic quantities (step costs, the oscillation-filter threshold) keep using the nominal curves.

The correction is an efficiency factor: measured efficiency over modelled efficiency. Below 1.0 means "slower than the curve says" in both directions, and the curve handed to the DP is eff × factor on both sides. That single definition is what makes one apply rule and one clamp correct for both.

It used to be stored as the raw measured / planned ratio, which means opposite things per direction — the planned SoC change is AC × eff when charging and AC / eff when discharging, so a slow pack moves less SoC than planned while charging and more while discharging. The module's rule is to only ever plan a battery as slower than its curve (a measurement may confirm the user's entry, not make the DP bolder), and on the discharge side that rule was therefore inverted: a genuinely derating pack produced a ratio above 1.0 and was discarded, while the optimistic direction was applied. The [0.5, 1.05] clamp truncated the same signal from the other end. Both are gone with the factor definition; stored payloads from before it are converted on load and re-clamped, which sends a history of the energy-counter artefact below to the clamp, where it is stored and never applied.

The correction may exceed 1.0; the resulting curve may not. A pessimistic entry has to be correctable upwards, so the factor itself is unbounded above (before clamping). The efficiencies built from it are physical quantities — charge_eff is pack energy stored over AC drawn, discharge_eff is AC delivered over pack energy drawn — so both override curves are capped at 1.0. Leaving the discharge side uncapped was defended as harmless because the curve never enters the cost model: true of the accounting and false of the decisions, since the DP selects its actions against exactly this transition. An over-unity discharge point lifts the modelled round trip towards 1.0, which makes price spreads far below the real break-even look profitable and produces charge/discharge churn on a nearly flat price curve.

The observation comes from the SoC delta. The per-battery cumulative kWh counters cannot supply it: a battery energy counter sits on the same side of the inverter as the setpoint that drove it — for an AC-coupled pack there is no other side to put it on — so measured-over-commanded is dispatch fidelity, not efficiency. Scored against a plan denominated in SoC it returns the conversion loss a second time, and the correction then cancels out the very efficiency the curve describes: a healthy pack acquires a discharge correction near its nominal efficiency and a charge correction pinned to the 1.05 clamp, whose product is ≈ 1. Only the SoC delta spans the conversion and can price it. The counters are still read, and their measured-over-commanded ratio is published as dispatch_fidelity on the calibration sensors — a device that stops following its setpoint is worth seeing — but it never reaches the curve. A SoC sensor reporting whole percent quantises at capacity / 100 — 0.1 kWh on a 10 kWh pack — so the minimum planned change worth sampling scales with the observed sensor resolution rather than a fixed 0.1 kWh. Factors outside [0.5, 1.5] are dropped rather than folded into the mean: an asymmetric clip (capped at 1.05, allowed down to 0.5) let symmetric measurement noise bias the correction below 1.0 for a healthy battery. Only the resulting mean is clamped, to [0.5, 1.05], before it is applied — both bounds acting on the factor, so they mean the same thing in both directions. A pack with counters but no usable SoC reading reports no_soc_measurement and takes no sample.

One calibration per battery. Each pack keeps its own window, its own storage key and its own pair of diagnostic sensors, and is scored against the setpoint it was given (battery_setpoints) rather than against the fleet plan. The dispatcher concentrates a setpoint on one battery at a time (see Section 12), so a single fleet-wide ratio measures whichever pack happened to be picked and then attributes it to all of them: a pack that is losing capacity is invisible, dragging the shared number down and having its healthy sibling planned pessimistically. A pack that was not dispatched in this direction reports battery_not_dispatched and takes no sample.

The planned SoC change per pack is |setpoint| × step_hours × charge_eff(|setpoint|) for charging and |setpoint| × step_hours / discharge_eff(|setpoint|) for discharging, using that battery's own curve at its own power — the curves are power-dependent, so a pack running at 1.2 kW is not described by the fleet's 2.4 kW point. The derating guard likewise uses the pack's own threshold and its own SoC.

The DP plans one SoC for the whole fleet, so it is handed the capacity-weighted aggregate of the per-battery corrections, taken over the packs that have actually measured something. A pack the dispatcher has never used carries no evidence, and averaging its nominal 1.0 in would report half the derating that was observed — an unmeasured pack is therefore assumed to behave like the measured ones rather than like the datasheet. The fleet sensors publish that aggregate; the per-battery sensors publish the individual measurements. On upgrade, a battery with nothing of its own seeds from the old fleet-wide store: that value is no longer the answer, but it is a better prior than nominal and each new sample replaces more of it.

The shadow price is always the raw DP value — there is no separate "post-processed" shadow price. Post-processing filters affect total_cost and savings (where the difference between raw and processed values shows the impact of filtered actions), but the shadow price is a DP concept that is not modified by post-processing.

Use by hybrid mode: λ is used by the coordinator as the charge/discharge switching threshold in hybrid mode. It is deliberately not fed back into the next run's terminal condition (see Section 5).

A planned discharge is executed when feed_in × discharge_eff(P_plan) ≥ λ (±5 % hysteresis) — the sale is priced at the curve efficiency for the power the DP planned, so the test uses the same economics that made the DP choose the action. Comparing a curve-derived λ against a sale priced at the representative scalar would veto the DP's own decision on batteries whose curve rises well above that mean.

When the test fails, the energy is worth more later than selling it now pays. That is a decision to hold, so the fallback is idle unless capturing the surplus is itself worthwhile by the same yardstick (λ × charge_eff(P_surplus) ≥ feed_in); zero-grid would otherwise buy PV surplus at exactly the feed-in price the veto just refused. This test applies in plain hybrid too — see control-modes.md.

A planned charge is tested the same way, against the buy price: importing 1 kWh of AC stores charge_eff(P_plan) kWh, so a stored kWh costs price / charge_eff + degradation, and the plan is followed only while λ ≥ that cost (±5 % hysteresis). This is what separates the two reasons the DP plans a charge. A cheap hour it deliberately buys in keeps λ above the cost of buying, so the import is executed as planned. A charge planned against forecast PV that did not arrive does not: λ then says the battery can be filled more cheaply later, and importing to keep the plan on paper is a loss. The fallback captures whatever surplus exists (zero-grid) or holds at idle when there is none — never grid import. Before this test the arbitration only ran while the meter showed export, which skipped exactly the case that needs it: the moment the charge starts importing (issue #174).

A negative feed-in price is the one case that keeps a commanded charge instead of falling back to zero-grid: exporting then costs money, and a setpoint that follows the meter deadlocks at ~0 W once the PV inverter curtails. It does not, however, license the import. The buy price is normally still positive, so the command is capped at the measured surplus (battery − grid) whenever λ does not justify buying the remainder — the plan runs on exactly what the sun delivers, and no more. Charging the surplus is self-correcting: the grid settles at ~0 W, and as PV recovers the surplus grows with it, so the setpoint climbs back to the plan on its own. Without the cap a charge planned on forecast PV stayed at full power through scattered cloud, importing at the buy price for the rest of the price period (issue #174).

Every hybrid branch measures the PV surplus as battery − grid rather than as the raw meter reading. The meter reads load + battery − pv, so it includes the battery's own action: a charge running on partial PV shows as import, and a zero-grid capture regulating the meter to ~0 W is indistinguishable from "no surplus left". Both made the surplus tests latch — once the battery acted, the reading no longer described the surplus it was acting on. battery − grid is pv − load by construction, so it is invariant to the setpoint and the hysteresis bands only have to damp sensor noise. The same measure drives the real-time idle → zero-grid upgrade, and the charge arbitration is repeated on every real-time tick (it is a handful of comparisons on the cached plan, no DP re-solve), so a failed PV forecast is corrected within seconds rather than at the next optimizer run.

Use by hybrid+ mode: hybrid+ additionally uses λ to gate PV-surplus capture when the DP itself plans idle. Plain hybrid stores any surplus as soon as it appears; hybrid+ only stores it when λ × charge_eff(P_surplus) exceeds the current feed-in price. Because λ already prices in upcoming cheap-surplus hours (e.g. a midday PV peak coinciding with low prices), a low λ means the battery can be filled more cheaply later — so the current surplus is exported at the (higher) feed-in price instead, with a ±5% hysteresis band around the threshold to prevent oscillation.

Conversely, when little future surplus is forecast, λ stays high: every kWh not captured now would have to be bought from the grid later, or is missing during expensive evening hours. The threshold λ × charge_eff ≥ feed-in is then met and hybrid+ captures the surplus immediately — identical to plain hybrid. No separate rule is needed; the shadow price encodes "how cheaply can the battery still be filled later" by construction. Exporting only wins when the battery would fill up anyway (little headroom relative to the forecast surplus) or when stored energy has little future value (flat prices, no discharge opportunity).


10. Rolling-Horizon Execution

The optimizer runs every 15 minutes, plus on a handful of event-driven triggers (new price period, a significant price change, a stale price/SoC sensor recovering, and a scheduled mid-period correction run at the midpoint of the current price period — see coordinator_optimization.py). Each run:

  1. Reads the current SoC and latest forecasts.
  2. Calls optimize_battery_schedule() with the latest forecasts and calibration overrides, re-solving the entire horizon from scratch (the terminal condition is derived fresh from the feed-in forecast each time — see Section 5 — not carried over from the previous run's shadow price).
  3. Executes only the first step of the resulting schedule (optimal_power_kw).
  4. Exposes the new shadow price for hybrid-mode thresholding and diagnostics.

This is called a rolling horizon or receding horizon approach. Re-optimizing every 15 minutes (or sooner, on the triggers above) allows the schedule to adapt as prices are updated, PV production deviates from forecast, or household consumption changes.

Because capacity is limited, each full re-solve is a global allocation across every cheap/negative-price opportunity in the horizon — how much of the current window to use now versus reserve for a better one later. A small change in inputs between two runs (price forecast update, revised PV/consumption forecast, or actual SoC drifting from the previous plan) can shift that allocation enough that two runs a few minutes apart show a visibly different schedule for what looks like an unchanged situation. This is expected, not a bug.

Convergence

The DP itself is stateless between runs — there is no shadow-price carry-over — but two things it depends on do build up from HA recorder history over time:

  • The historical price model (used before day-ahead prices are published, and to extend a short horizon) improves as more price/weather data accumulates.
  • The household consumption pattern needs several weeks of kWh sensor history to build accurate forecasts.

While these are still calibrating (first 2–4 weeks), forecasts are noisier, so the schedule may change more noticeably between runs — including between two runs within the same 15-minute slot — and may appear more aggressive than the long-run optimum.


11. Numerical Considerations

Several implementation details prevent subtle correctness bugs:

Issue Fix
Floating-point SoC boundary min_soc_wh = round(capacity × min_pct / 100 × 1000) — avoids 212.0 < 212.00000000000003
Sub-resolution actions Skip any non-idle action that doesn't cross a SoC state boundary
Partial first step Use step_durations_hours[1] (not min(step_durations_hours)) to compute power_step_w; optimizer always uses step 0 as the immediate setpoint (primary runs are at period boundaries so step 0 is full)
Horizon-end discharge Terminal condition V[T][s] = -stored_kwh × terminal_price prevents horizon-end drain
Feed-in price None Coordinator always falls back to CONF_FIXED_FEED_IN_PRICE; returning None would cause the DP to use the grid buy price, making PV arbitrage always unprofitable
Efficiency curve scalar round_trip_efficiency = chg_eff_repr × dis_eff_repr, each the mean of its curve over 5..95 % of nominal power — never the zero-power value, which is the worst point of a realistic curve
Derating precomputed outside t-loop soc_max_charge_w[s] and soc_max_discharge_w[s] are arrays computed once from soc_states before the backward pass, avoiding repeated method calls in the tight inner loop
Step cost recomputed per SoC state The step cost only depends on SoC through the DC-PV headroom term. Each step precomputes one cost per action plus the SoC below which it is valid: unbounded without DC PV and for every discharge action, the headroom threshold for charge/idle under DC PV. Roughly a 3.4x solve-time reduction; results are unchanged, which tests/test_cross_impl.py proves because simulate_diagnostics.py has no such cache
Forecast series anchored elsewhere PV, consumption and feed-in are projected onto the DP's own step windows with resample_to_steps rather than resampled by interval length, which assumed both series started at the same instant and shifted them by up to 45 minutes on hourly prices

12. Variable Price Intervals (15-min / 30-min / hourly)

The DP is fully interval-agnostic: all energy quantities are scaled by step_durations_hours[t], so the same algorithm handles 15-minute, 30-minute, and hourly prices without modification.

How the interval is detected

helpers.py auto-detects the price interval from the sensor's attributes:

  1. Sensors with per-entry timestamps (net_prices_today, raw_today, etc.): the delta between the first two start timestamps determines the interval (15, 30, or 60 min).
  2. Sensors without timestamps (today, tomorrow, bare float lists): defaults to 60 min.

Detection happens in _detect_interval_from_entries(). The result flows into:

  • extract_price_forecast_with_timestamps() → returns (prices, start_times, interval_minutes)
  • compute_step_durations_hours() → computes per-step durations aligned to price boundaries

Scheduling

The optimizer runs are event-driven, synchronised to the price sensor:

Trigger When Purpose
_handle_price_change (period boundary) start_times[0] changes Primary run; step 0 is always a full interval
Mid-period correction period_start + interval/2 Corrects SoC drift from the primary run
DC coordinator fallback 60-min interval Safety net if above triggers miss

For sensors without timestamp attributes the fallback is a >10% price-change threshold.

Step duration alignment

The first DP step covers only the remaining time within the current price slot (partial interval). All subsequent steps are full intervals. This prevents energy miscalculation at price boundaries.

Because primary runs fire at period boundaries, step 0 is always (or nearly always) a full interval. The partial-step case only occurs on HA restarts mid-period or during mid-period correction runs; in both cases the DP step 0 action is used directly.

Price interval Steps per day First step Full steps DP table size
60 min 24 ≤ 60 min 1 h = 1.0 h each 24 × SoC states
30 min 48 ≤ 30 min 0.5 h each 48 × SoC states
15 min 96 ≤ 15 min 0.25 h each 96 × SoC states

PV and consumption resampling

PV production and household consumption forecasts are emitted by the forecast coordinator at FORECAST_INTERVAL_MINUTES (15-minute) resolution, aligned to quarter-hour boundaries starting at the current step. The weather input (open-meteo) is hourly; hourly series are expanded to 15-minute steps by repetition (mean-preserving), while the solar-geometry model is evaluated per 15-minute timestamp, so dawn/dusk ramps gain sub-hourly shape even from hourly radiation data. Consumption comes from hourly pattern buckets and is expanded by repetition too.

The optimization coordinator resamples from the pipeline's native interval (published as forecast_interval_minutes in the coordinator data; 60 is assumed for data from older versions) to the price interval:

  • resample_to_steps(pv_forecast_kw, forecast_start_utc, forecast_interval_minutes, step_starts, step_durations_hours) — each DP step takes the duration-weighted average of the source intervals its own window overlaps
  • The projection is by timestamp, not by interval length, because the two series have different anchors: the forecast series starts at the current quarter-hour, while step k starts at a price-period boundary and step 0 is the shortened remainder of the current period. Resampling by interval length alone shifted the whole series by up to 45 minutes at hour boundaries

Historical-model alignment

The historical price model predicts per local hour (its lookup key is hour-of-day × weekday × GHI bin × wind bin). Both places its output is used are anchored on real timestamps rather than on a step count:

  • Horizon extension — the model starts at the first step the live forecast does not cover (last live period start + price_interval), and its hourly output is projected onto those step windows with resample_to_steps.
  • Reference series (price_forecast_predicted / feed_in_price_forecast_predicted, published for prediction-vs-actual comparison; never an optimizer input) — the model starts at the local hour containing step 0 and is projected onto the DP's own step grid.

The weather features are sliced from the weather coordinator's own forecast_start_utc, so the GHI/wind values handed to the model belong to the hours it is predicting even when the weather series was fetched in an earlier hour.

Anchoring on a step count instead breaks this whenever the live prices do not cover a whole number of hours from the top of the current hour — the normal case for a 15-minute price sensor publishing through midnight — and shifts the entire modelled tail up to a full hour, which moves the next day's charge and discharge windows with it.

Past-entry exclusion for timestamp-bearing sensors

For sensors like Nordpool raw_today (96 entries per day with explicit start timestamps), past entries are skipped by comparing each entry's start + interval against now. This is identical to the net_prices_today handling and correctly excludes elapsed 15-min slots regardless of the current minute within an hour.


13. Baseline Cost and Savings

The baseline cost represents the electricity cost without any battery. In this scenario:

  • All consumption is met directly from the grid
  • All AC PV surplus is exported at the feed-in price
  • DC-coupled PV panels still produce, but without a battery to absorb the DC output, all DC PV goes through the inverter to AC (at DC_TO_AC_INVERTER_EFFICIENCY)

Raw vs processed costs: The optimizer reports both raw (DP-derived) and post-processed costs:

  • raw_total_cost: V[0][current_soc_idx] from the DP value function
  • total_cost: Recalculated from the filtered schedule via _calculate_schedule_total_cost
  • The difference shows the impact of post-processing filters (typically < 0.01 EUR when no actions are filtered, due to floating-point differences in SoC reconstruction)
  • savings = baseline_cost - initial_terminal_value - total_cost

14. Summary

Inputs: SoC, price/PV/consumption forecasts, battery config
         │
         ▼
[3] Discretize SoC (grid of states) and power (grid of actions)
         │
         ▼
[5] Set terminal condition V[T][s] = -(stored_kwh × terminal_price)
         │
         ▼
[6] BACKWARD PASS (t = N-1 → 0)
    For each (t, s): V[t][s] = min_a { step_cost(t, s, a) + V[t+1][s'] }
    Store optimal action in policy[t][s]
         │
         ▼
[7] FORWARD PASS
    Trace policy from current SoC → power/mode/SoC schedule
         │
         ▼
[8] Post-processing
    Oscillation filter: remove unprofitable charge↔discharge switches
    Micro-cycle filter: suppress tiny charge/discharge blocks
         │
         ▼
[9] Compute shadow price λ from V[0] gradient
         │
         ▼
Output: power_schedule_kw, mode_schedule, soc_schedule_kwh,
        shadow_price_eur_kwh, savings estimate
         │
         ▼
[10] Execute step 0, save λ, wait 15 min, repeat

Per-array PV forecast calibration

Each PV array can carry a measured production counter. The forecast for that array is then scored against what it actually produced and multiplied by a learned gain factor.

The factor is an energy-weighted ratio over the last PV_CALIBRATION_WINDOW sampled steps — sum(measured) / sum(forecast), not a mean of per-step ratios. A quarter hour under cloud has a large relative error on a tiny amount of energy, and weighting by energy stops those steps dominating an estimate that is meant to describe a gain error.

Samples are only taken in the middle of the array's rating (10–90 % of kWp): below the floor the signal is smaller than the noise, above the ceiling inverter clipping dominates and is not a forecast error. The ceiling has to sit above what an array genuinely reaches — a well-oriented array peaks near 85 % of its rating on a clear summer day, and a lower ceiling excludes exactly the steps with the best signal-to-noise ratio, leaving a south array learning only from its oblique, diffuse-dominated hours and then applying that error all day. Typical DC/AC ratios of 1.1–1.2 put real clipping at 83–91 %.

Steps are skipped entirely while PV curtailment is active, when the elapsed window is not the window the forecast described, and when the counter jumps backwards. Within the accepted window the planned energy is stretched to the time that actually elapsed: this coordinator also refreshes when new weather arrives, so a meter delta covering 20 minutes is regularly scored against a snapshot describing 15, and a late run alone would read as a 33 % better array.

The applied factor is clamped and only used once PV_CALIBRATION_MIN_SAMPLES observations exist. That floor is what separates a gain error from the weather: an array only ever samples in its own part of the day, so it picks up the radiation forecast's bias for those hours, and at a couple of dozen samples — one afternoon of production — that bias is the correction. A correction is reported as applied only when it has been derived and differs from nominal by more than PV_CALIBRATION_APPLY_EPSILON, the same gate the forecast itself uses, so "being corrected" cannot mean something different on the sensor than it does in the model.

What it can and cannot fix. A wrong tilt or orientation entry, soiling and a string that is down are gain errors: the array produces a roughly constant fraction of what the model expects, and the factor captures that. Shading is not — it is a function of sun position, so a single scalar smears a morning-only obstruction across the whole day. Modelling that needs a horizon profile, which this does not attempt.


12. Multi-Battery Dispatch

The DP optimizer treats all configured batteries as a single aggregated virtual battery (aggregate_battery_configs). After the optimizer produces a combined setpoint, _split_setpoint distributes it across the individual inverters.

Aggregating SoC-dependent derating. The fleet is assumed to sit at a common relative SoC, so above the fleet threshold the combined limit is the sum of what each pack can still do there: its own derated limit if it derates, its full rating if it does not. The threshold is the first one reached — the lowest of the packs that actually derate for charging, the highest for discharging — not a capacity-weighted average, which would mix real thresholds with the 100 %/0 % sentinels of packs that do not derate and, paired with a sum of only the derated powers, cap the whole fleet at one pack's reduced rating.

Entry-level settings (the grid capacity cap, DC coupling) are not battery properties and are overlaid onto the aggregate by the coordinator's _apply_entry_level_config.

SoC-gap triggered concentration

The dispatch strategy is determined by the relative-SoC gap between batteries:

rel_soc_i = (soc_i - min_soc_i) / (max_soc_i - min_soc_i)   ∈ [0, 1]
gap = max(rel_soc) − min(rel_soc)
Gap Strategy
gap < 0.10 Concentrate on one battery
gap ≥ 0.10 Proportional split to rebalance

Why concentration at low gap: splitting a small setpoint (e.g. 100 W) across two inverters results in each receiving ~50 W. Most home battery inverters are inefficient at very low power (high fixed conversion losses relative to throughput). Concentrating on one inverter avoids this and provides more stable real-time tracking in zero-grid mode.

Why proportional split at high gap: when SoC has diverged, one battery is being disproportionately cycled. Proportional splitting (weighted by available headroom/energy) rebalances the SoC levels over time.

Battery selection for concentration

When concentrating, which battery is chosen depends on the control mode:

Mode Selection criterion
zero_grid / hybrid / hybrid_plus Closest to 50% rel_soc — can handle charge and discharge direction changes longest without hitting a SoC limit
Scheduled charge Lowest rel_soc (most headroom)
Scheduled discharge Highest rel_soc (most energy available)

Hysteresis: the active battery only changes when the best candidate's score exceeds the current battery's score by more than _SOC_HYSTERESIS = 0.05. This creates three zones:

gap < 0.05   → concentrate, no switch (hysteresis holds)
0.05 ≤ gap < 0.10 → concentrate, switch to better battery
gap ≥ 0.10   → proportional split, reset active battery selection

Power-overflow redistribution

Within the proportional split path, batteries that reach their max_charge_power_kw or max_discharge_power_kw limit have the overflow redistributed iteratively to the remaining batteries. This ensures the combined setpoint is fully absorbed even when one inverter is at its power limit.