Repository navigation
Archive the completed M45 milestone - #180
Merged
Merged
Conversation
Every item of M45 was already archived under its own heading and left a stub; the stubs are removed, as the checklist rules say for a completed milestone, and the milestone's own account (why it was done, the decision and measurements, the items and the pull request that landed them) is archived as one entry that links them. DESIGN-NOTES and PLANS pointed at the live milestone and now point at the archive; the PLANS row for PARKED.md names both parked items by what they wait for. Co-authored-by: Copilot <223556219+Copilot@users.noreply.github.com>
Contributor
There was a problem hiding this comment.
🟢 Approval recommended
No active review issues block approval of the documentation-only milestone archival changes.
No open issues 🎉
What changed in this PR
Archives M45, the long-haul and probation test-tier milestone delivered in #178, while preserving its rationale, item history, and links to parked follow-up work. This PR changes documentation only.
Changes:
- Adds a milestone archive entry linking the previously archived items.
- Removes the completed M45 section and stubs from the active checklist.
- Updates references and clarifies the gates for parked follow-up work.
| File | Description |
|---|---|
PLANS.md |
Removes M45 from active work and clarifies parked follow-up gates. |
DESIGN-NOTES.md |
Points the M45 work reference to its archive. |
COMPLETED-CHECKLIST.md |
Adds the milestone summary, provenance, and item links. |
CHECKLIST.md |
Removes the completed M45 section and stubs. |
Review effort: Balanced
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Archives the completed M45 milestone (the long-haul and probation tiers, landed in #178).
COMPLETED-CHECKLIST.md: one entry for the milestone (why, the decision and measurements, the pull request), linking its ten items, each already archived under its own heading.CHECKLIST.md: the M45 section and its ten stubs are removed, as the checklist rules say for a completed milestone.DESIGN-NOTES.mdandPLANS.md: references to the live milestone now point at the archive, and thePARKED.mdrow namesM45+.1andM45+.2by what each waits for.Documentation only;
check-archives.ps1andcheck-encoding.ps1pass.