Repository navigation
Conversation
Point the Electric Power Annual extract at the 2025 edition and extend CONTROLLED_YEARS so electric industry prices follow EIA retail through 2025; years after that span keep BEA change on the EIA-based last year.
bl-young
marked this pull request as ready for review
November 19, 2026 19:19
WesIngwersen
approved these changes
Nov 19, 2026
WesIngwersen
left a comment
Member
There was a problem hiding this comment.
Looks good just scanning it
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
cc:
Closes: #1207
What changed? Why?
The EIA Electric Power Annual extract uses the 2025 edition (calendar years 2015-2025), and
CONTROLLED_YEARSincludes 2025 so electric industry price levels follow EIA average retail through that year. Years after the span keep BEA year-to-year change on the EIA-based last year, with no seam at the last EIA year.Impact
With
electric_output_on_retail_revenueon, 2025 electric lines (221100,S00101,S00202) inflate on EIA retail; 2026 stays on BEA deltas from the EIA 2025 level, and nowcast SUT years remain 2017-2024.Testing
Unit tests for the EIA utility adjustment and published price-index overlay; live check that overlaid 2025 equals 2017 BEA level times EIA retail relative to 2017, and 2026 equals BEA change on that EIA 2025 level.
Review focus
xls/epa.zipwhile local/GCS cache staysepa-{edition_year}.zip.Heads-up
GCS uploads are done:
EIA_ElectricPowerAnnual_2025_v1.0.0_b7e98acparquet + metadata underflowsa/FlowByActivity/, andepa-2025.zipunderextract/input-data/EIA_ElectricPowerAnnual/. Re-run the failedtestjob after those objects landed.Required follow-up for CEDA: republish and pin the Cornerstone price-index artifact for
2026Q2so CEDA's EF dollar-year publish reads EIA retail for electric through 2025. Runtime overlay in bedrock is not enough for CEDA's pinned parquet path.