Skip to content

Pull requests: openshift/sippy

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

Trt 2709 jobrunid mapping csr post backfill approved Indicates a PR has been approved by an approver from all required OWNERS files.
#3965 opened Aug 28, 2026 by neisw Contributor Loading…
Remove Sippy Chat ok-to-test Indicates a non-member PR verified by an org member that is safe to test. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3964 opened Aug 27, 2026 by not-stbenjam Contributor Loading…
Automated - Update config ./config/openshift.yaml ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3963 opened Aug 27, 2026 by openshift-ci Bot Loading…
TRT-2884: add label publisher and application API (phase 3) jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3962 opened Aug 27, 2026 by redhat-chai-bot Contributor Loading…
Fix historical test count query using wrong release for presubmits do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command.
#3961 opened Aug 27, 2026 by machine424 Loading…
TRT-2866: Upgrade react-router-dom to v8 in Sippy frontend jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3960 opened Aug 27, 2026 by openshift-trt-agent Bot Loading…
6 tasks done
TRT-2924: Component Readiness cell status is non-deterministic when mixing MissingBasis/MissingSample with NotSignificant tests jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3959 opened Aug 27, 2026 by redhat-chai-bot Contributor Loading…
TRT-2932: Fix presubmit risk analysis comparing against wrong release jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3956 opened Aug 27, 2026 by machine424 Loading…
MPICT: Add ocp-chaos jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. lgtm Indicates that a PR is ready to be merged. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3954 opened Aug 26, 2026 by oharan2 Contributor Loading…
agent instructions: include coderabbit and other guidance approved Indicates a PR has been approved by an approver from all required OWNERS files. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3942 opened Aug 24, 2026 by sosiouxme Member Loading…
TRT-2733: Add CR BigQuery/PostgreSQL parity tooling approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#3925 opened Aug 20, 2026 by mstaeble Contributor Loading…
TRT-2895: Force close regressions approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3913 opened Aug 18, 2026 by redhat-chai-bot Contributor Loading…
Trt 2709 partitioning phase2 post migration approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#3908 opened Aug 17, 2026 by neisw Contributor Draft
TRT-2865: Add CI job to run the integration tests jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3854 opened Jul 30, 2026 by openshift-trt-agent Bot Loading…
5 tasks done
wip: add support for parsing JUnit testcase lifecycle do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#3823 opened Jul 24, 2026 by everettraven Draft
[WIP] Add analyze-db.sh script for post-restore database warmup approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3790 opened Jul 20, 2026 by mstaeble Contributor Draft
3 of 4 tasks
config: add CAPZ e2e stage job to aro-stage do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#3689 opened Jun 24, 2026 by RadekCap Contributor Draft
1 task
config: add CAPZ e2e integration job to aro-integration do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3688 opened Jun 24, 2026 by RadekCap Contributor Draft
1 task
OCPQE-32065: Proposed Implementation for Spot Check Jobs approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#3612 opened Jun 11, 2026 by dgoodwin Contributor Loading…
OCPNODE-4125: Promote non-techpreview disruptive longrunning jobs to standard tier for component readiness jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3537 opened May 18, 2026 by QiWang19 Member Loading…
Make BGP jobs standard do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3503 opened May 6, 2026 by tssurya Contributor Draft
Remove osde2e rosa-hcp nightly job from customizations needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3501 opened May 6, 2026 by smarthall Member Loading…
1 task
Update pkg/api/README.md to align with current codebase needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. ready-for-human-review Indicates a PR has been reviewed by automated tools and is ready for human review
#3407 opened Apr 6, 2026 by redhat-chai-bot Contributor Loading…
Test PR Please Ignore needs-ok-to-test Indicates a PR that requires an org member to verify it is safe to test.
#3395 opened Apr 1, 2026 by dgoodwin-devin Loading…
ProTip! Find all pull requests that aren't related to any open issues with -linked:issue.