Repository navigation
Apply knowledge query scope to graph results and summaries - #789
Closed
flip-engineer wants to merge 2 commits into
Closed
flip-engineer wants to merge 2 commits into
flip-engineer wants to merge 2 commits into
Conversation
Collaborator
Author
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Knowledge graph traversal and summary results now apply the requested scope through the production query and presentation routes. The tests cover scoped and unscoped results, cross-scope inputs and the actual control output.
Remote focused qualification passed all 214 candidate assertions at
93221d663; the identical target fixtures recorded 160 failures. Check, C generation, linking and fixture processes completed with retained original waits. Full Main compilation and the public runtime suite remain pending.Addresses #783. This draft is stacked on #772. Merge and normal release qualification remain pending.